Skip to content

Design · Production · Installation

Produced in Türkiye · Door-to-door across Europe

Premium signagesystems andinteriors

Design, production and installation in one team. You see the sign in 3D before it is built — then we produce it in Türkiye and install it door to door anywhere in Europe.

BECZITFRIENOATDETR
Scroll down
Illuminated SignsChannel LettersNeonFaçade CladdingInteriors3D DesignVehicle WrapInstallation

What we do

Interiors, signage and installation — all three on our own team.

When a façade job is split between a design studio, a fabricator and an installer, the responsibility gets split too. We do all three ourselves: the people who measure, draw, cut, paint and install are the same. There is one number to call when something comes up on site, at any stage of the job.

0

Countries served

0+

Projects delivered

0

Years in production

0mo

Production warranty

Warm neon sign glowing at night

From the atelier

Atelier & production — Türkiye

Anatomy

A channel letter is built from four layers

Scroll and the letter assembles: body, module, diffuser and light stack up.

01Aluminium bodyLaser-cut, bent returns and a back plate.
02LED moduleConstant-current driver, modules on 60 mm centres.
03Acrylic diffuserA 5 mm opal face that spreads the light without hot spots.
04Light3000K warm white, run lit for 24 hours before it ships.

Services

From design to installation, under one roof

Every step runs through our own team, so nothing gets lost in the handovers and responsibility stays in one place.

Process

Six steps, one point of contact

Production without surprises is possible. The only condition is that decisions get made at the table, not on site.

01Duration · 1–2 days

Brief & Discovery

We get to know the façade, the location and the target customer. Asking the right questions early removes expensive corrections later.

  • /Façade photos and measurements
  • /Neighbouring façade analysis
  • /Budget and schedule range
  • /Permit requirements
02Duration · 3–6 days

Design & 3D

Three concept variants are modelled onto a photo of your own façade, by day and by night. The decision is made on screen.

  • /Type and proportion study
  • /Day + night renders
  • /Material board
  • /Light intensity simulation
03Duration · 2–4 days

Engineering

The chosen design becomes a scaled production drawing: sub-frame, power runs, fixing points and tolerances.

  • /Static and wind loads
  • /Wiring schematic
  • /Fixing hardware detail
  • /Bill of materials
04Duration · 7–15 days

Atelier Production

CNC cutting, bending, welding, painting and LED assembly happen in our own atelier, with photographic progress reports at each stage.

  • /CNC cutting
  • /Profile bending and welding
  • /Oven-baked paint
  • /LED and driver assembly
05Duration · 1 day

QC & Packing

The sign runs lit for 24 hours in the atelier for heat and hot-spot checks, then is packed for its specific transport route.

  • /24-hour burn-in test
  • /Colour and hot-spot check
  • /Corner protection and surface film
  • /Numbered packing list
06Duration · 1–3 days

Freight & Installation

Insured freight, customs tracking and on-site installation — completed on the planned day without closing the business.

  • /Customs documentation
  • /Insured freight
  • /Certified installation crew
  • /Handover report and warranty

Coverage

From Türkiye to eight countries

Belgium, Czechia, Italy, France, Ireland, Norway, Austria and Germany. Customs, freight and installation all run through one desk.

  • TürkiyeAtelier
  • NorwayOslo
  • IrelandDublin
  • BelgiumBrüksel
  • GermanyBerlin
  • CzechiaPrag
  • FranceParis
  • AustriaViyana
  • ItalyMilano

Country not on the list? If the logistics work, we will find a way — just ask.

References

What they said after handover

Plenty of firms quote without seeing the façade. Mango sent a night render before production and the finished job matched it exactly. No surprises.

Yusuf A./BY Kebab/Owner — Paris
01 / 05

FAQ

Common questions

If your question isn't here, write to us directly — we reply the same day.

Two ways. For standard projects we send a step-by-step survey guide that an operator completes in about 15 minutes with a phone. For complex or high façades, our own team or a local partner takes a laser survey on site.

Let's start

Send us a photo of your façade and we'll show you how it looks at night.

A few photos and rough dimensions are enough for a free preliminary visualisation. First draft shared within 48 hours.