For each of the six steps, what happens, how long it takes and who owns it is agreed up front.

  1. 01

    Brief & Discovery

    We get to know the façade, the location and the target customer. Asking the right questions early removes expensive corrections later.

    Includes

    • /Façade photos and measurements
    • /Neighbouring façade analysis
    • /Budget and schedule range
    • /Permit requirements

    Duration

    1–2 days

  2. 02

    Design & 3D

    Three concept variants are modelled onto a photo of your own façade, by day and by night. The decision is made on screen.

    Includes

    • /Type and proportion study
    • /Day + night renders
    • /Material board
    • /Light intensity simulation

    Duration

    3–6 days

  3. 03

    Engineering

    The chosen design becomes a scaled production drawing: sub-frame, power runs, fixing points and tolerances.

    Includes

    • /Static and wind loads
    • /Wiring schematic
    • /Fixing hardware detail
    • /Bill of materials

    Duration

    2–4 days

  4. 04

    Atelier Production

    CNC cutting, bending, welding, painting and LED assembly happen in our own atelier, with photographic progress reports at each stage.

    Includes

    • /CNC cutting
    • /Profile bending and welding
    • /Oven-baked paint
    • /LED and driver assembly

    Duration

    7–15 days

  5. 05

    QC & Packing

    The sign runs lit for 24 hours in the atelier for heat and hot-spot checks, then is packed for its specific transport route.

    Includes

    • /24-hour burn-in test
    • /Colour and hot-spot check
    • /Corner protection and surface film
    • /Numbered packing list

    Duration

    1 day

  6. 06

    Freight & Installation

    Insured freight, customs tracking and on-site installation — completed on the planned day without closing the business.

    Includes

    • /Customs documentation
    • /Insured freight
    • /Certified installation crew
    • /Handover report and warranty

    Duration

    1–3 days

FAQ

Common questions

If your question isn't here, write to us directly — we reply the same day.

Two ways. For standard projects we send a step-by-step survey guide that an operator completes in about 15 minutes with a phone. For complex or high façades, our own team or a local partner takes a laser survey on site.

Let's start

Send us a photo of your façade and we'll show you how it looks at night.

A few photos and rough dimensions are enough for a free preliminary visualisation. First draft shared within 48 hours.